DWP Taunton case study window shading and blinds installation - Capricorn Contracts

DWP Taunton

Sector

Location

Architect

Contractor

Project overview

We partnered with DWP Taunton to install chain-operated roller blinds and wand operated vertical blinds, offering durable and efficient light control for office spaces.

We installed:

  • R200M Chain Operated Roller Blinds
  • V110 Vertical Wand Operated Vertical Blind

OUR SOLUTION

Contractor: Vinci Facilities

Architect: TP Bennett

Location: Taunton

Completion Date: April 2023

Products

  • 110 R200M Chain Operated Roller Blinds

Have a similar project?

Capricorn Contracts mosaic brand colour strip separator graphic.

gallery

tp Bennett Logo
Vinci Facilities Logo

DWP Taunton

Sector:
Location:
Architects:
Contractors:

We partnered with DWP Taunton to install chain-operated roller blinds and wand operated vertical blinds, offering durable and efficient light control for office spaces.

We installed:

  • R200M Chain Operated Roller Blinds
  • V110 Vertical Wand Operated Vertical Blind
tp Bennett Logo
Vinci Facilities Logo
DWP Taunton case study window shading and blinds installation - Capricorn Contracts

RELATED CASE STUDIES