Chorlton High School case study window shading and blinds installation - Capricorn Contracts

Chorlton High School

Sector

Location

Architect

Contractor

Project overview

We partnered with Chorlton High School to install chain-operated and cassette blinds, enhancing both the functionality and appearance of their learning spaces.

We installed:

  • R200S Chain Operated Roller Blinds
  • CS800S Cassetted Blind with Sidewinder Operation
  • C40/90 Cassetted Blinds

OUR SOLUTION

Contractor: BAM Construction

Architect: BAM Construction

Location: Manchester

Completion Date: June 2021

Products

  • 155 R200S Chain Operated Roller Blinds
  • 18 CS800S
  • 30 C40/90 Cassetted Blinds

Have a similar project?

Capricorn Contracts mosaic brand colour strip separator graphic.

gallery

Bam Construction Logo

Chorlton High School

Sector:
Location:
Architects:
Contractors:

We partnered with Chorlton High School to install chain-operated and cassette blinds, enhancing both the functionality and appearance of their learning spaces.

We installed:

  • R200S Chain Operated Roller Blinds
  • CS800S Cassetted Blind with Sidewinder Operation
  • C40/90 Cassetted Blinds
Bam Construction Logo
Chorlton High School case study window shading and blinds installation - Capricorn Contracts

RELATED CASE STUDIES