Castlebrae High School case study window shading and blinds installation - Capricorn Contracts

Castlebrae High School

Sector

Location

Architect

Project overview

We worked with Castlebrae High School in Edinburgh to install chain-operated roller blinds, hardwired motorised blinds, and chain-operated cassette roller blinds, enhancing functionality and light control throughout the school.

We installed:

  • R200S Chain Operated Roller Blinds
  • R240L Hardwired Motorised Roller Blinds
  • C83 Chain Operated Cassetted Roller Blinds
  • Control Switches

OUR SOLUTION

Contractor: Morrisons Construction

Architect: Jmarchitects

Location: Edinburgh

Completion Date: April 2022

Products

  • 140 R200S Chain Operated Roller Blinds
  • 10 R240L Hardwired Motorised Roller Blinds
  • 4 C83 Chain Operated Cassetted Roller Blinds
  • 10 Control Switches

Have a similar project?

Capricorn Contracts mosaic brand colour strip separator graphic.

gallery

Capricorn Contracts mosaic brand colour strip separator graphic.
JM Architects Logo
Morrisons Construction Logo

Castlebrae High School

Sector:
Location:
Architects:
Contractors:

We worked with Castlebrae High School in Edinburgh to install chain-operated roller blinds, hardwired motorised blinds, and chain-operated cassette roller blinds, enhancing functionality and light control throughout the school.

We installed:

  • R200S Chain Operated Roller Blinds
  • R240L Hardwired Motorised Roller Blinds
  • C83 Chain Operated Cassetted Roller Blinds
  • Control Switches
JM Architects Logo
Morrisons Construction Logo
Castlebrae High School case study window shading and blinds installation - Capricorn Contracts

RELATED CASE STUDIES