Wells Cathedral School case study window shading and blinds installation - Capricorn Contracts

Wells Cathedral School

Sector

Location

Contractor

Project overview

We partnered with Wells Cathedral School to install high-quality blackout roller blinds, providing effective light control solutions tailored to the school’s specific requirements.

We installed:

  • Shy Zip System Motorised Blackout Roller Blinds
  • Shy FTS Lifting Motorised Blackout Blinds

OUR SOLUTION

Contractor: Shaylor Group

Architect: Eric Parry Architects

Location: Wells

Completion Date:

 

Products

  • 36 Shy Zip System Motorised Blackout Roller Blinds
  • 12 Shy FTS Lifting Motorised Blackout Blinds

Have a similar project?

Capricorn Contracts mosaic brand colour strip separator graphic.

gallery

Eric Parry Architects
Shaylor Group

Wells Cathedral School

Sector:
Location:
Architects:
Contractors:

We partnered with Wells Cathedral School to install high-quality blackout roller blinds, providing effective light control solutions tailored to the school’s specific requirements.

We installed:

  • Shy Zip System Motorised Blackout Roller Blinds
  • Shy FTS Lifting Motorised Blackout Blinds
Eric Parry Architects
Shaylor Group
Wells Cathedral School case study window shading and blinds installation - Capricorn Contracts

RELATED CASE STUDIES