Wimbledon High School case study window shading and blinds installation - Capricorn Contracts

Wimbledon High School

Sector

Location

Architect

Project overview

We partnered with Wimbledon High School to install chain-operated and motorised roller blinds, offering flexible and modern shading solutions for learning spaces.

We installed:

  • R200S Chain Operated Roller Blinds
  • 240L Motorised Roller Blinds
  • C20-60 Sidewinder Cassetted Chain Operated Roller Blinds
  • Channel Control Switches

OUR SOLUTION

Contractor: Neilcott Construction

Architect: IID

Location: London

Completion Date: August 2022

Products

  • 50 R200S Chain Operated Roller Blinds
  • 20 240L Motorised Roller Blinds
  • 1 C20-60 Sidewinder Cassetted Chain Operated Roller Blinds
  • Channel Control Switches

Have a similar project?

Capricorn Contracts mosaic brand colour strip separator graphic.

gallery

IDD Architects Logo
Neilcott Construction Logo

Wimbledon High School

Sector:
Location:
Architects:
Contractors:

We partnered with Wimbledon High School to install chain-operated and motorised roller blinds, offering flexible and modern shading solutions for learning spaces.

We installed:

  • R200S Chain Operated Roller Blinds
  • 240L Motorised Roller Blinds
  • C20-60 Sidewinder Cassetted Chain Operated Roller Blinds
  • Channel Control Switches
IDD Architects Logo
Neilcott Construction Logo
Wimbledon High School case study window shading and blinds installation - Capricorn Contracts

RELATED CASE STUDIES